FOC date? DSL FAQ
Links: home · search · speed test · login · more ·


Search for: in all FAQs

FOC date? (#254)

Firm Order Commitment. The date at which outside wiring is scheduled (and the order becomes "real"). The normal procedure for a DCLEC DSL install, is for the Telco to schedule a FOC date to your MPOE (minimum point of entry). The ISP should advise you of your FOC date, (if one is required), as you may have to be there to let them have access.

feedback form
edited by KeysCapt
last modified: 2004-01-02 11:43:20

Also read About DSL for lots more information
Thank you for using lo-fi dslreports.com - report bugs
© 99-2009 silver matrix LLC